View all Courses
Quantity Surveying
Bachelor of Science (Honours)
Course Details
Course Code | SG_JQNTY_K08 |
---|---|
Level | 8 |
Duration | 1 |
Credits | 60 |
Method of Delivery | On-campus |
Campus Locations | Sligo |
Mode of Delivery | Full Time |
Course Overview
The primary objective of this course is to equip the student with a broad base of skills so that upon completion the graduate can identify and solve measurement and contract administration problems in the specialised area of quantity surveying.
As a highly qualified graduate, you will be able to participate in construction design teams and building teams and fulfil the requirements of a qualified quantity surveyor. You will have an understanding of the need for high ethical standards in practice, including the responsibilities of the profession towards people and the environment, and you will be able to work effectively individually and in multidisciplinary teams. As a quantity surveyor, you will have the capacity to communicate effectively with other professionals and society at large.
The course is designed to bring you to a level whereby participation in a professional quantity surveying environment is the next logical step. This is designed to occur in a steady progression over the two semesters. Specialist modules such as Quantitative Studies, Property Development and Economics, Construction and Financial Management, Multi-Disciplinary Project, Capital Works Management Framework, Property and Facilities Management and BIM for Quantity Surveyors are studied, the year culminating in the submission of a dissertation which will have been prepared over the course of the academic year.
Course Details
Year 1
Semester | Module Details | Credits | Mandatory / Elective |
---|---|---|---|
1 |
Measurement of Complex Structures, Ground ServicesAnalysing, description and measurement, in accordance with ARM, of basements, piling, retaining structures, underpinning, waterproofing, concrete joints and external services (water, drainage) and site works (paving's, edges, fencing, grassing, planting) and demolitions, alterations and falsework, waste water treatment construction. Measurement software will be an essential element of the learning practice in this module. Learning Outcomes 1. Analyse, describe and measure basements, piling, retaining structures, underpinning, waterproofing, concrete joints 2. Appraise, schedule, describe and measure external services – watermain with associated fittings and chambers; foul and surface water drainage 3. Inspect, schedule, describe and measure ‘siteworks’ (‘Surface Paving, Fencing and Landscaping’ as per ARM) – pavings, edgings/kerbs, fencing/boundary walling, grassing, planting 4. Demolitions and alterations – study ‘as is’ and ‘proposed work’ drawings, distinguish the relevant ‘demolition’ and ‘alteration’ work areas, describe and measure for inclusion in a Bill of Quantities in accordance with ARM4 5. Describe and measure construction of structure such as ‘waste water treatment plant’ so as to consider ‘falsework’, ‘concrete work’ and ‘reinforcement’ in the context of complex concrete building construction |
05 | Mandatory |
1 |
Complex Structures and Civil Engineering Construction TechnologyThis module aims at providing the learner with an understanding Civil Works involved with complex structures and Civil Engineering projects. Learning Outcomes 1. Identity and understand temporaryand false worksrequired for difficult sites and deep excavations 2. Describe substructure works required for complex buildings 3. Describe site development works for roads and footways 4. Describe drainage works for foul, storm and water supply services. 5. Describe process and structures involved in water treatment & wastewater treatment plant construction |
05 | Mandatory |
1 |
Property Development and EconomicsThis module details the characteristics of the property and construction industries and the factors that influence them. The module also evaluates the different investment appraisal techniques required by decision makers and the influence of Government policy on these industries. Learning Outcomes 1. Assess the different investment appraisal techniques used in the property and construction industries. 2. Examine the key stages involved in the property development process. 4. Critically evaluate the role and effectiveness of government intervention in the construction industry. |
05 | Mandatory |
1 |
Capital Works FrameworkThe aim of this module is to provide the student with an understanding and appreciation of the integrated set of contractual provisions, guidance material, technical templates and procedures which cover all aspects of the delivery process of a public works project from inception to final project delivery and review. Learning Outcomes 1. Demonstrate a critical awareness of the documentation required by the Capital Works Framework when procuring a public works contract. |
05 | Mandatory |
2 |
Building Information Modelling for Quantity SurveyorsThis module examines the Building Information Modelling process and its practical application to estimators/quantity surveyors. Learning Outcomes 1. Appraise the problems in the construction process requiring a BIM solution 2. Evaluate the implementation of BIM withinnational, organisational and individual contexts. 3. Appraise the processes in various standards and specifications leading to common data environments and the development of BIM execution plans. 4. Discuss the implications of Building Information Modelling on the role of the Quantity Surveyor/Estimator |
05 | Mandatory |
2 |
Commercial Management for the Quantity SurveyorThe aim of this module is to develop students awareness and understanding of the key characteristics associated with the effective operation of the construction firm within an ever-changing environment. The module also evaluates the areas where lean production theories can make a significant impact in construction. Learning Outcomes 1. Assess the techniques and tools available to manage risk and value throughout the development process. 3. Evaluate the difference sources of finance used for construction and property development and the importance of cash flow forecasting. 4. Develop the ability to analysis whole life costing during the development and design of construction projects. 5. Critically evaluate the importance of supply chain management to the successful running of a construction project. |
05 | Mandatory |
2 |
Measurement of Civil Engineering WorksThe module will appraise and analyse Civil Engineering-type structures and constructions and will create structured description writing and measurement practice in a cross-section of areas – 'general items', piling, bridges, retaining structures, watermains, roads, conventional buildings (associated with Civil Engineering work – ie 'pumphouse'), drainage, tunnelling, cofferdams – and will select the rules and regulations of CESMM4 and the software package 'Mudshark' in describing and measuring some/all of the work. Measurement software will be an essential element of the learning practice in this module. Learning Outcomes 1. Analysethe document CESMM and it’s application to the preparation of descriptions and measurement in the creationof a Bill of Quantities for work of a Civil Engineering nature – tabulation, coding, description classification; applying the software package ‘Mudshark’ to compliment areas of the work; describe and measure ‘general items’as they apply to a ‘given project’ 2. Analyse, describe and measure bridges, piling andretaining structures in accordance with CESMM 3. Schedule work associated with watermainsand drainage; describe and measure both in accordance with the rules and regulations of CESMM 4. Assess, describe and measure roads and conventional buildings (associated with Civil Engineering work – ie ‘pumphouse’) in accordance with CESMM 5. Determine the Bill of Quantity requirements when measuringtunnelling andcofferdams – describe and measure as per CESMM for inclusion in a Bill of Quantities |
05 | Mandatory |
2 |
Public Works ContractThe aim of the module is to enable the student to acquire a thorough understanding of contract administration of public works contracts. Learning Outcomes 1. Demonstrate a critical awarenessof the administration process of the public works contract from commencement to completion. 2. Formulate advice for the Client and the Design team with respect to cost and the financial administration of the project. |
05 | Mandatory |
Year |
Capstone ProjectThis module is designed as a total problem-based learning experience to develop students' critical thinking, analytical, ethical and problem-solving skills required of construction professionals working in a modern, complex built environment. Quantity Surveyors will work as part of interdisciplinary and multidisciplinary teams, involving Construction Project Managers, Interior Architects, Structural Engineers and Health & Safety Professionals, on multifaceted community-based projects while being facilitated by lecturers. Learning Outcomes 1. Demonstrate an awareness of and articulate a personal knowledge base of principles, practice and theories-in-use from cognate modules 4. Develop competence in active- and self-motivated tasks 7. Synthesisein a logical and coherent manner crediblesolutions to complex multifaceted problems 8. Defend evidenced basedcourses of action 9. Reflect critically on their practice and procedure |
10 | Mandatory |
Year |
Research Methods and DissertationThis module requires students to propose an original research problem on a topic of relevance to the quantity surveying discipline. With the support of research theory and under the supervision of an assigned quantity surveying supervisor, students will navigate the complete research process culminating in the production of a dissertation. Learning Outcomes 1. Identify and formulate a research problem and generate related research question(s) 2. Discuss and take instruction and act upon tutor advice 3. Articulate the aims of the investigation 4. Produce a well-focused literature review 5. Apply appropriate theoretical approaches and methodology(ies) 6. Collect relevant data and analyse them in light of the research questions 7. Present findings in a coherent and logical manner 8. Synthesise relevant conclusions from the body of research and analysis 9. Present a selfcontained document in an academically acceptable manner 10. Defend the content and findings of the dissertation at an oral examination |
10 | Mandatory |
Progression
Graduates can progress directly to the Level 9 Certificate in Mechanical and Electrical Quantity Surveying or the Level 9 Masters in Project Management offered by ATU Sligo or to other related Level 9 courses at other third-level Institutions.
Download a prospectus
Entry Requirements
The BSc (Hons) Quantity Surveying add-on programme is directed at graduates who have obtained a minimum final result of 50% in a cognate Level 7 degree. Graduates who have not obtained this minimum may incorporate other qualifications and / or relevant work experience and apply for assessment via the Institutes Recognition of Prior Learning process.
Careers
Graduates will be qualified to obtain employment in a wide variety of areas such as consultant quantity surveying firms, contracting organisations, specialist sub-contracting firms and elsewhere within the industry. Graduates may operate specifically as quantity surveyors or may become involved in related areas of work such as project management, property management and dispute resolution.
Further Information
Contact Information
Civil Engineering & Construction